For structural stud welding projects, the project may require a Welding Procedure Specification (WPS). A WPS should match the actual field condition. If the stud size, position, base material, or equipment setup changes, the WPS may need to be reviewed.

Stud Information Needed

  • Stud type and diameter
  • Stud length and material
  • Threaded, headed, DBA, or special stud
  • Ferrule type if required

Base Material Information Needed

  • Base material type and thickness
  • Beam, plate, embed, deck, column, or other condition
  • Coating, primer, galvanizing, paint, or surface condition

Welding Position

  • Downhand / flat
  • Sidehand / horizontal
  • Vertical
  • Overhead
  • Through-deck
  • Direct-to-steel

Equipment Information Needed

  • Stud welding machine and gun type
  • Cable length and ground cable setup
  • Power source or generator
  • Polarity, time setting, and amperage/current setting
  • Lift and plunge

Testing Information Needed

  • Preproduction testing requirements
  • Bend testing, torque testing, or tension testing
  • Visual inspection requirements
  • Project-specific testing

Simple Customer Intake Information

  • What stud are you welding? (e.g., 3/4 x 5-3/16 headed stud, 5/8 threaded stud, D2L DBA)
  • What are you welding to? (e.g., beam flange, embed plate, metal deck, stainless panel)
  • How thick is the base material?
  • Is it structural? (Yes / No / Not sure)
  • Is AWS D1.1 required? (Yes / No / Not sure)
  • What position are you welding in?
  • How many studs are required?
  • Where is the job located?