This page answers common inspection questions that come up on structural stud welding jobs.
A full, uniform weld flash around the stud is a strong visual indicator of a proper arc stud weld. However, acceptance should always follow the applicable code, project specification, and required testing. If part of the weld flash is missing, the stud may need additional evaluation through bend testing, torque testing, tension testing, or replacement.
Do not automatically keep welding without investigating. Lack of flash on one side can be caused by gun angle, ferrule not seated, dirty base metal, deck gap, poor plunge, arc blow, poor ground, or incorrect settings. The crew should stop, correct the issue, and test as required.
For headed studs only: if there is lack of flash without visual signs of undercutting at the base of the stud, AWS D1.1 permits the stud to be bent 30 degrees away from the side with the missing flash and left in that bent position. If the weld shows no cracking after bending, the stud is considered acceptable and may remain in service per AWS D1.1. This does not apply to threaded studs or deformed bar anchors — those require a different evaluation method.
Threaded studs are often not practical to bend because the threads can be damaged. In those cases, the project may require torque testing, tension testing, or another accepted method. Confirm the test method with the inspector, project specification, and engineer when needed.
Stud spacing is a design issue. If studs were installed at the wrong spacing, the engineer of record or responsible design professional should review the condition and approve the repair. The welding contractor or supplier should not make that design decision alone.
Through-deck stud welding depends on the stud welding through the deck and fusing to the beam below. If the deck is not tight to the beam, weld quality can suffer. The deck condition should be corrected or evaluated before production continues.
Wet ferrules can cause porosity and inconsistent welds. Ferrules should be stored dry and protected from rain, standing water, and jobsite moisture. If ferrules become wet, do not assume they are acceptable for production.
A WPS is common on structural stud welding jobs. The WPS should match the actual job condition, including stud size, base material, position, ferrule, and equipment settings. If jobsite conditions change, confirm whether the WPS still applies.
Sidehand and overhead stud welding are more difficult than downhand welding and may require additional procedure qualification or testing. Confirm before production starts.